The City of Bellevue Utilities Department contracted with CM Design Group to provide PS&E documents for pavement overlay and restoration work following their annual AC Watermain Replacement Projects. The original contract was from 2014 through 2017, but because we finished under budget, CM Design Group was able to complete the 2018 contract, as well, within the original project budget. CM Design Group was then awarded the contract from 2019-2023.

Bellevue utilities overlay Bellevue utilities overlay

CM Design Group's Role

Tasks on this project included preparation of base maps, site analysis, and preparation of permits, outreach mailers, traffic control plans, and PS&E documents. PS&E documents included asphalt overlay, pavement repairs, utility adjustments and pavement markings. The City of Bellevue provides water service for other small adjacent cities that require different permitting and restoration requirements. We prepared permits and incorporated requirements from Clyde Hill, Medina, and Hunts Point into the PS&E documents.

Key Components

  • Full width pavement overlay and rechannelization
  • Permitting for several local agencies
  • Multi-year contract